Rabu, 13 April 2011

tugas rekayasa jalan raya 1

TUGAS REKAYASA JALAN RAYA 1
MIFTACHUL DIMAS WIDO HADIANSYAH  

NPM: 0953010004  


 
 X      Y
 1      1,46
 3      3,04
 5      5,44
 7      7,24
 9      8,64
 11    6,04
 13    4,34
 15    2,04
 17    1,74


 A = ½ .2 ( 1,94+2(3,04+5,44+7,24+8,64+6,04+4,34+2,04)+1,74)
  = 1x77.24
  = 77.24 m²
Jadi ongkos pengerukan
total biaya = 77.24 X Rp 250.000=
Rp.19.310.000




Tidak ada komentar: